As Planned vs As Built

What is As Planned vs As Built?

As-planned and as-built are two essential phases in the lifecycle of mobile network projects, spanning from pre-construction through post-construction. These terms are pivotal in the context of active equipment changes, network upgrades, and expansions.

For MNOs, closing the data gap between as-planned and as-built evaluations is crucial to maintaining operational performance. Planned analysis ensures that the as-planned design aligns with operational goals and deployment schedules. During the construction phase, construction schedule analysis plays a critical role in tracking progress, identifying delays, and ensuring alignment with project timelines. The as-built schedule, finalized post-construction, captures the actual timeline of completed work and highlights any deviations from the original plan.

Even small discrepancies—such as a 3-degree tilt misalignment or a 5% azimuth deviation—can result in significant performance challenges, including reduced coverage and increased interference. By integrating construction schedule analysis with as-planned and as-built evaluations, MNOs can identify issues early, validate construction quality, and optimize network performance.

Key Components of As-Built vs. As-Planned

Coverage Map

Coverage maps are vital tools in both pre-construction planning and post-construction validation.

  • As-planned maps: Predict expected network coverage based on theoretical simulations and design parameters.
  • As-built maps: Reflect real-world performance post-deployment, accounting for environmental factors, interference, and installation variations.

MNOs use these maps to optimize coverage, inform future expansion strategies, and provide accurate data to stakeholders, including end-users and TowerCos.

Network Planning

Network planning encompasses pre-construction and construction phases, guiding the design and deployment of mobile network infrastructure.

  • As-planned phase: Focuses on site selection, capacity needs, and compliance with regulations.
  • As-built phase: Provides validation of these plans by measuring real-world network conditions, enabling MNOs to refine their strategy and ensure regulatory compliance.

RF Engineering

RF engineering spans all phases of the network lifecycle, from pre-construction modeling to post-construction validation.

  • As-planned: Engineers optimize the placement of antennas and other equipment to achieve the desired coverage and capacity based on simulations and theoretical data.
  • As-built: Real-world conditions are evaluated post-construction, allowing engineers to fine-tune equipment placement and address any discrepancies in network performance.

This iterative process is vital for ensuring that MNOs meet coverage and capacity objectives.

Addressing the Gap Between As-Built and As-Planned

The as-built vs. as-planned gap highlights discrepancies between what was planned and what was executed. This gap can emerge at any stage of the workflow, from pre-construction to post-construction.

For example:

  • A planned site may project a 10 km coverage radius, but as-built measurements reveal only 7 km due to environmental obstructions or interference.
  • Addressing such discrepancies helps MNOs validate construction quality, optimize network performance, and ensure alignment with operational objectives.

Solution in Workflow Context:

  • Pre-construction: Accurate inventory and RAD data ensure that planning reflects the true starting conditions.
  • Planning: Simulations and 3D IFC models predict performance and guide stakeholder decision-making.
  • Construction: On-site validation ensures deviations from as-planned designs are identified and corrected in real-time.
  • Post-construction: Accurate as-built analyses verify network performance and provide actionable insights for ongoing optimization.