The main cost drivers for cell tower construction typically fall into three categories: pre-development, direct materials, and site construction. Pre-development costs include site acquisition, zoning, permitting, and engineering. Direct materials cover items such as steel, concrete, fencing, and lighting. Site construction costs include foundation installation and tower erection. When new towers are built unnecessarily, these costs are incurred without adding meaningful new capacity, increasing overall capital expenditure.