31 Dec 2025 Written by Naomi Stol Zamir

They align early on feasibility, access, power, and structural constraints using a shared view of the current site configuration. Working from the same as-built baseline helps prevent late design changes and site revisits during execution.

Back to All Posts

Related Articles